
Technical Assistance for supervision of the works within the Project Finalization of Glina wastewater treatment plant, rehabilitation of the main sewerage collectors and of Dambovita sewer collector (sewer box)
a 3.5 million euros project where EPTISA Romania performs the works supervision services
October 05, 2020
https://www.youtube.com/watch?v=bC0IpcbW3Es&feature=youtu.be