Study on Operation Optimization of the Bilge Plant in the Madrid – Barajas Airport

It also includes proposals and drawing up a project containing the activities required to optimise the plant’s operations
Sector Airports (Transport)
CountrySpain (Europe)

Description

The project involves carrying out a study on operation optimization of the bilge plant at Madrid-Barajas Airport and making proposals and drawing up a project containing the activities required to optimise the plant’s operations adapting the effluent to the legislation currently in force.

Activity

The work done is as follows:

  • Preparing a study of current environmental legislation concerning the treatment plant.
  • Visiting the current plant and compiling operating data concerning the effluent coming from the aircraft that is discharged in the plant and the treated waste that flows out of it.
  • Diagnosis of plant operations that is consistent with the qualities of the waters to be treated and the disposal requirements.
  • Studying solutions and proposals for ways of dealing with the problems detected, as well as proposing optimisation and improvements.
  • Developing the two options selected at a project level, in compliance with the following criterion:
  • Basic solution, the one that amounts to the lowest investment that enables those concerned to strictly comply with the legislation governing the plant effluent.
  • Optimum solution, which not only complies with the legislation currently in force, but also envisages certain improvements that can be justified.