Platform and track for the connection between Atocha and Chamartin stations, Madrid

Works supersion of the platform and track construction for the U.I.C. width railway connection
Sector Urban Works (Instrumentation and monitoring)
CountrySpain (Europe)

Description

Eptisa carries out the continuous monitoring of structure and the surrounding that might be affected by the tunnel construction within a highly dense area of buildings and infrastructure.

The works are for the development of a soundings plan, together with onsite installation and instrumentation monitoring during works execution for the 7.4-kilometre tunnel, using a tunnel-boring machine (EPB).