Finalization of Glina wastewater treatment plant, rehabilitation of the main sewerage collectors and of Dambovita Sewer Collector (Sewer Box)
Duration | October 2015 - September 2019 |
Sector | Hydraulic Infrastructure (Water and Environment) |
Water Treatment Plants (Water and Environment) | |
Country | Romania (Europe) |
Description
Eptisa will provide high quality level of supervision activities for the works contracts, by ensuring compliance with Law 10/1995 on quality construction and all the relevant Guidelines, norms and laws in force, by observing the general and special conditions of contracts of works, and by performing certified design checking of the technical-economic documentation (Technical Project and Detailed Design) prepared by Contractors designer.
The works supervised are very complex and include 6 works contract concerning the realization of the Wastewater Treatment Plant Glina (lane 2) and the incinerator for sludge, rehabilitation of main collectors A0 and B0 parallel to the Dambovita River, simultaneously achieving a drain associated to the collector A0, rehabilitation of the collection box located under the tank of clean water of Dambovita River, and implementation of sewerage collectors in Regina Maria / Carol / Tineretului areas. During the first stage the supervision will be performed for the following works contracts:
- CL1 - Extension of the WWTP and construction of the sludge incinerator;
- CL2 - Construction of the drainage system in the right side of the Sewer Box and other works to the sewerage and evacuation from the lakes Titan, Tineretului and Carol;
- CL3 - Rehabilitation of the main sewerage collectors A0 and B0.
During the second stage supervision of works will be performed for other 3 works contracts:
- CL4 - Rehabilitation of the Sewer Box and its drainage system on the left side of the Sewer Box (in the sectors Ciurel-Unirii-Vitan);
- CL5 - Rehabilitation of the Sewer Box (in the sector Vitan-Glina);
- CL 6- Rehabilitation/replacement of the sewerage network (in Cotroceni, Regina Maria and Tineretului).
This is a project that symbolizes Eptisa recognition for work done so far and is a real test from the technical point of view.